Saturday, November 7, 2015

More On The Floor.

Once all the painting was done, we resumed work on the interior.


The rest of the bead board was installed in the front of the bus.


I placed a string down the center of the bus, sprayed paint over it, and began placing the peel and stick floor tiles diagonally down the center.


Once the center tiles were in place, we filled in the rest.


Seems like a shame that we will cover this beautiful floor with a full size bed.


The diagonal run helps to break up the length of the bus.


With the new floor down, we could install the cabinets and booth permanently.


The swivel rockers fit nicely, and are strapped in for transport. We will unstrap them and spread them out once we arrive at our destination.


The cabinets were anchored to the wall, the counter top and back splash was installed, and then the stove top, which Brandyn cleaned up and painted with high temp grill paint. I also installed the faucet.


We ordered a table pedestal online, and after some modification, it worked perfectly. Brackets also attach the table to the wall to keep it secure

We purchased a few air mattresses to get us by on the first trip. Eventually, we will have some custom foam mattresses made for all 4 bunks.


I installed some carpet transition trim up front where the tile meets the rubber floor, and some stair tread trim covers up the visible underlayment in the stairwell.


Another piece of the stair tread trim was installed at the back door.